2024-11-05
http://w3.windfair.net/wind-energy/news/30337-vestas-wind-energy-v136-3-45-mw-turbine-tall-turbine

News Release from windfair.net

List_windfair_logo_pos

Wind Industry Profile of


The Taller the Better: New 202 MW order for Vestas featuring tallest turbines in US

Vestas has received an order for 56 V136-3.45 MW turbines delivered in 3.6 MW Power Optimised Mode for an undisclosed wind project in the U.S.

We’re pleased to expand our tall tower technology and 4 MW platform. The combination of taller towers and 4 MW technology is perfectly designed to extract the abundant resource at the site, and deliver low-cost, reliable energy to the community and customer”, said Chris Brown, President of Vestas’ sales and service division in the United States and Canada.

With 112m tall towers and a tip height of 180m, the project will be the tallest in the U.S. Deploying taller towers unlocks new and previously unharnessed wind resource areas, and further increases the project’s annual energy production. 

The order includes supply and commissioning of the turbines as well as a ten-year Active Output Management 5000 (AOM 5000) service agreement, designed to maximise uptime and energy production and ensure optimised performance for the lifetime of the project.

Deliveries will begin in the third quarter of 2019, with commissioning scheduled for the fourth quarter.

Source:
Vestas
Author:
Windfair Editors
Keywords:
Vestas, wind energy, V136-3.45 MW turbine, tall turbine



All news from windfair.net

List_windfair_logo_pos

news in archive


Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.windfair-us
  • Newlist_kaeufer_logo
  • Newlist_logo.drakawind
  • Newlist_canrea_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020