News Release from BRAUN Windturbinen GmbH
Wind Industry Profile of
Assembly of the Antaris in Sweden!
The Antaris 7.5 works here in 3-phase mains parallel with the FIMER TRIO 7.5 kW.
Special feature: The CK11 generator has been given a performance update by strengthening the magnetic field. This has resulted in an increase in performance and improved voltage stability.
The wind is monitored via a wind sensor installed on the mast and a PLC installed in the cabinet.
Additional safety parameters include V DC voltage monitoring and the helicopter function.
The wooden mast was manufactured here, as was the implementation of the installation: https://innoventum.se/dali-performance/
If you have any questions about the project, please contact us, we will be happy to advise you.
Enjoy the wind with Antaris wind turbines!
- Source:
- BRAUN Windturbinen
- Author:
- Press Office
- Link:
- www.braun-windturbinen.com/...
- Keywords:
- Braun Windturbinen, Sweden, mast, wood, small wind, wind turbine, installation, stability