News Release from BRAUN Windturbinen GmbH
Wind Industry Profile of
07/14/2023
And on we go in northern Germany!
The wind turbine works 3-phase parallel to the grid with the TRIO 5.8 from FIMER: https://www.braun-windturbinen.com/.../wind-wechselrichter/
Wind monitoring is carried out via PLC (installed in the control cabinet), as well as with a small wind sensor which is installed on the mast via a bracket. The braking resistor (6.0 kW) together with the helicopter function controls the overload in gusts. 36kWh / day directly after commissioning, congratulations!
If you have any questions about the project, please contact us, we will be happy to advise you.
Enjoy the wind with Antaris wind turbines.
- Source:
- BRAUN Windturbinen
- Author:
- Press Office
- Link:
- www.braun-windturbinen.com/...
- Keywords:
- Braun Windturbinen, north, small wind, mast, load, installation, wind turbine, Antaris, Germany, repeller