2024-03-29
http://w3.windfair.net/wind-energy/pr/43956-braun-windturbinen-germany-erection-installation-small-wind-turbine-yield-antaris

News Release from BRAUN Windturbinen GmbH

List_braun_windturbinen_logo

Wind Industry Profile of


Mounting structure of the Antaris 5.5 kW in Schleswig-Holstein

The installation is carried out on a 12 m high tilt mast.

Image: BRAUN WindturbinenImage: BRAUN Windturbinen

The wind turbine operates 3-phase parallel to the grid with the Smart!wind SW5.5, and as a backup heating system with 2 6.0 kW heating rods for the respective domestic hot water tanks.

And yes, the customers with their Antaris wind turbines are to be envied. Some people are now more relaxed about the energy future.

If you have any questions about the project, please contact us, we will be happy to advise you.

 

Enjoy the wind with Antaris wind turbines.

 

Source:
BRAUN Windturbinen
Author:
Press Office
Link:
www.braun-windturbinen.com/...
Keywords:
Braun Windturbinen, Germany, erection, installation, small wind, turbine, yield, Antaris



All news from BRAUN Windturbinen GmbH

List_braun_windturbinen_logo

news in archive


Thematically suitable Windfair.net members in the business directory

  • Newlist_braun_windturbinen_logo
  • Newlist_sabowind_logo
  • Newlist_pavana_logo_rgb_pfade_
  • Newlist_ts_logo_rgb
  • Newlist_peikko_logo
  • Newlist_geonet_logo
  • Newlist_ge_renewable_energy_blau
  • Newlist_logo.labkotec
  • Newlist_pce-instruments-logo-300dpi
  • Newlist_xervon_engl_logo
  • Newlist_minimax_logo
  • Newlist_reyher
  • Newlist_rts_wind_ag_logo_652x312px
  • Newlist_sunbelt_logo
  • Newlist_hailo_wind_systems_logo_alternativ_grau
  • Newlist_schaeffler_logo
  • Newlist_logo_idaswind
  • Newlist_logo.otti
  • Newlist_cga_logo
  • Newlist_windhunter_service_2_
  • Newlist_iwtma_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020