News Release from BRAUN Windturbinen GmbH
Wind Industry Profile of
03/29/2021
The Antaris 3.5 kW in Sweden!
The system works off-grid in a 3-phase hybrid system with Sunny Island.
The system was installed by Innoventum, Mr. Daligault: https://www.innoventum.se/
Thanks to Julien for his perfect job!
If you have any questions about the project, please call us!
- Source:
- BRAUN Windturbinen
- Author:
- Press Office
- Link:
- www.braun-windturbinen.com/...
- Keywords:
- Braun Winturbinen, Sweden, instalation, mast, small wind, turbine