News Release from BRAUN Windturbinen GmbH
Wind Industry Profile of
The Antaris 5.5 kW in Jülich
Here, the plant works 3-phase parallel to the grid with the Smartwind SW5.5 (https://smart-power-electronics.de/).
Furthermore, the system is equipped with a wind sensor for wind shutdown and a bat control with temperature and wind recording.
https://www.braun-windturbinen.com/produkte/fledermausschutz/
In order to meet the requirements of the structural engineer, a vibration monitoring system was also installed on the mast.
The system is used here for research purposes and data evaluation with regard to the various specialist areas.
Congratulations and many thanks to the fitters from SAW (https://www.saw-stahlbau.de/) for the successful installation!
If you have any further questions about the project, please call us!
Enjoy the wind with ANTARIS wind turbines.
- Source:
- BRAUN Windturbinen
- Author:
- Press Office
- Link:
- www.braun-windturbinen.com/...
- Keywords:
- BRAUN Windturbinen, small wind, Jülich, Germany, roof, mast, bat, installation, turbine