2024-11-22
http://w3.windfair.net/wind-energy/pr/32850-deutsche-windtechnik-offshore-senvion-turbine-service-trianel-borkum-ii-wind-farm-maintenance

News Release from Deutsche Windtechnik Ltd.

List_deutsche_windtechnik_logo

Wind Industry Profile of


Deutsche Windtechnik is taking over turbine service for the new Senvion turbines at the Trianel Windpark Borkum II offshore wind farm

Deutsche Windtechnik has received another order to provide maintenance for offshore wind turbines. Following offshore wind farm alpha ventus and offshore wind farm Riffgat, the independent full-service provider is now also responsible for maintenance of the 32 Senvion 6.3M 152 turbines at Trianel Windpark Borkum II.

The main service tasks include troubleshooting the wind turbines (including guaranteed availability), remote fault elimination, spare parts management and logistics from Borkum or Emden.

"We are delighted to have found an experienced and reliable partner in Deutsche Windtechnik to take over the service contract for the Senvion turbines," said Klaus Horstick, Managing Director of Trianel Windkraftwerk Borkum II GmbH & Co. KG.

"We were awarded the contract for turbine service at Trianel Windpark Borkum II due to our extensive experience in the maintenance of Senvion turbines. In addition, we also offer know-how for the entire offshore turbine and peripherals, our engineering and our technical and multi-brand expertise. We are the only offshore ISP that has this level of expertise in different types of system technology as well as secondary disciplines. This makes us a unique strategic partner for our customers to meet their individual requirements", said Matthias Brandt, Board Director at Deutsche Windtechnik AG. "Following the orders for Riffgat, alpha ventus and now Trianel Windpark Borkum II, we are making continuous progress in expanding our offshore activities, especially the area of turbine service. For our work at the Borkum cluster, this means that we are further reducing the number of interfaces in order to utilise cost-saving potential, especially in the logistics area."

Trianel Windpark Borkum II is the second expansion stage of the municipal offshore wind farm in the North Sea. As part of the expansion, 32 wind turbines with a total output of around 200 MW will be constructed and put into operation. Twenty municipal utilities, regional energy suppliers and municipal companies are involved in the Trianel Windpark Borkum II.

Source:
Deutsche Windtechnik
Author:
Press Office
Link:
www.deutsche-windtechnik.com/...
Keywords:
Deutsche Windtechnik, offshore, Senvion, turbine, service, Trianel, Borkum II, wind farm, maintenance, Windpark



All news from Deutsche Windtechnik Ltd.

List_deutsche_windtechnik_logo

news in archive


Thematically suitable Windfair.net members in the business directory

  • Newlist_deutsche_windtechnik_logo
  • Newlist_bwts_logo_2021
  • Newlist_logo.overspeed
  • Newlist_xervon_engl_logo
  • Newlist_eno_energy_ogo_claim
  • Newlist_schaeffler_logo
  • Newlist_anemos_logo_neu
  • Newlist_prysmian_logo_rgb
  • Newlist_rts_wind_ag_logo_652x312px
  • Newlist_hoffmeier_logo_links_172_1820x_
  • Newlist_wpd-logo
  • Newlist_logo.tuev-sued-offshore
  • Newlist_windrad_logo-1-rgb
  • Newlist_ge_vernova_standard_rgb_evergreen
  • Newlist_logo.hodijcoatings
  • Newlist_logo_idaswind
  • Newlist_plarad_logo_blau_ptw.jpeg
  • Newlist_bmu_logo
  • Newlist_ts_logo_rgb
  • Newlist_peikko_logo
  • Newlist_akzonobel_logo_rgb_blue

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020