2024-12-22
https://w3.windfair.net/wind-energy/pr/26645-a2sea-tp-transition-piece-merkur-owf-germany-foundation

TP installation on Merkur OWF

SEA CHALLENGER is currently engaged in Transition Piece (TP) installation on the 396MW Merkur Offshore Wind Farm for GeoSea.

SEA CHALLENGER will transport and help install the 66 TPs. Load out port is Eesmhaven, Holland. SEA CHALLENGER can carry six TPs at a time.

Employer of the Merkur Offshore Windfarm is Merkur Offshore GmbH, (a joint venture between its shareholders Partners Group, InfraRed Capital Partners, DEME Concessions and Coriolis) and with GeoSea as main contractor for the Balance of Plant scope (EPCI).

The Merkur Offshore Wind Farm will be one of Germany’s largest wind farms and when fully commissioned in 2019, it will provide around 500,000 German households with renewable power. GE will supply 66 Haliade 150-6 megawatt offshore turbines, installed by DEME, and built and operated by Merkur Offshore Wind Farm. Merkur is located approximately 45km north of the islands of Borkum.

Source:
A2SEA
Author:
Press Office
Link:
www.a2sea.com/...
Keywords:
A2SEA, TP, transition piece, Merkur, OWF, Germany, foundation




Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_hannover_messe_logo
  • Newlist_logo_web_inkl_neuer_url_web.energy
  • Newlist_peikko_logo
  • Newlist_logoschwarzelektromotoren
  • Newlist_irena_logo
  • Newlist_logo_2019_mit_signe
  • Newlist_logo.stahlwille
  • Newlist_ge_vernova_standard_rgb_evergreen
  • Newlist_wwf_logo_neu
  • Newlist_logo_gedore_de_cmyk_blue
  • Newlist_energiequelle_logo
  • Newlist_logo-kracht_claim
  • Newlist_kaeufer_logo
  • Newlist_pce-instruments-logo-300dpi
  • Newlist_klauke-logo
  • Newlist_energyconsult_lifecycleservices_logo
  • Newlist_logo.addinol
  • Newlist_ts_logo_rgb
  • Newlist_logo.deutscher-wetterdienst
  • Newlist_logo.engr.wisc
  • Newlist_precitorc_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020