2024-11-22
http://w3.windfair.net/wind-energy/news/7993-awea-and-wind-on-the-wires-file-comments-with-ferc-on-midwest-transmission-cost-allocation-proposal

News Release from American Clean Power Association (ACP)

List_american_clean_power_logo

Wind Industry Profile of


AWEA, and Wind on the Wires File Comments with FERC on Midwest Transmission Cost Allocation Proposal

The MISO proposal will replace an "interim" cost proposal that required generators to pay nearly all the costs of network upgrades

The American Wind Energy Association (AWEA) and Wind on the Wires (WOW) filed both supportive and opposing comments with the Federal Energy Regulatory Commission (FERC) on a proposal by the Midwest Independent System Operator (MISO) that could encourage the development of wind resources.

The MISO proposal will replace an "interim" cost proposal that required generators to pay nearly all the costs of network upgrades. AWEA and WOW protested that filing, arguing that it was equivalent to requiring the next car on a congested highway to pay for the full cost of adding a new lane. AWEA generally supports the current MISO proposal, with some modifications, as it represents a significant improvement over the existing cost allocation proposal.

The proposal would create a new category of transmission projects called Multi-Value Projects (MVPs). The MVP concept is based on the recognition of the various, widely-shared benefits provided by enhanced transmission infrastructure. Lines designated as MVPs would receive broad cost allocation across the MISO footprint. MVPs would help develop needed transmission infrastructure and provide access to wind energy, which would enhance states' ability in that region to achieve their renewable energy requirements and create new jobs.

“The proposed MVP policy says that the Midwest is ready to step up to the plate and support wind power development and unlock the associated manufacturing and supply chain jobs throughout the region. If adopted with some modifications, the proposed mechanism would spread the costs of new transmission infrastructure, allowing the region to build a robust transmission grid that will bring reliability and economic benefits as well as supporting state, regional and national policy goals," said AWEA CEO Denise Bode.

The proposal also seeks to make permanent the interim allocation recovery approach with respect to network upgrades, under which generator interconnection customers would bear virtually all costs. By putting all costs for such facilities on generators, this proposal would likely create a barrier to wind development in the Midwest. AWEA and WOW encourage FERC to reject this part of the proposal and require that costs for such facilities be shared by all their beneficiaries.

About www.windfair.net:
For more information on this article from AWEA, or if you would like to know more about what services www.windfair.net can offer, please do not hesitate to contact Trevor Sievert at ts@windfair.net

We also invite you to visit AWEA's Information Stand on www.windfair.net by simply clicking on the links “More Company Information and News” or directly on the company’s logo. Here a whole array of company information and further articles on AWEA can be accessed.

www.windfair.net is the largest international B2B Internet platform – ultimately designed for connecting wind energy enthusiasts and companies across the globe - the Who Is Who in the wind energy sector!
Source:
American Wind Energy Association
Author:
Posted by Trevor Sievert, Online Editorial Journalist
Email:
windmail@awea.org
Link:
www.awea.org/...
Keywords:
wind energy, wind power, wind turbine, onshore, offshore, windmill, www.windfair.net, Trevor Sievert, ECA



All news from American Clean Power Association (ACP)


Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.windfair-us
  • Newlist_kaeufer_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020