News Release from BRAUN Windturbinen GmbH
Wind Industry Profile of
10/02/2024
Antaris 2.5 kW installation in Potsdam!
The Antaris 2.5 kW is installed here on a 10m high wooden mast ‘Giraffe’ from the company INNOVENTUM. Antaris 2.5 kW.
The Antaris works 1-phase grid-parallel with the UNO 3.3 (FIMER) in a hybrid system with the installed PV system, mounted on the ‘back of the giraffe’.
If you have any questions about the project, please contact us, we will be happy to advise you.
Enjoy the wind with Antaris wind turbines!
- Source:
- BRAUN Windturbinen GmbH
- Author:
- Rüdiger Braun (Technical Director)
- Email:
- info@braun-windturbinen.com