Posted by:
GE Renewable Energy selects Mammoet for Dogger Bank heavy lifting job
Official Press Release GE Renewable Energy:
GE Renewable Energy selects Mammoet to supply onshore heavy lifting and transport for Dogger Bank Wind Farm
Cranes will support staging of 277 sets of blades, nacelles, and towers at Able Seaton Port / Project will become largest offshore wind farm in world when complete
GE Renewable Energy announced today that it has selected Mammoet UK, based in Thornaby Teesside, to supply onshore heavy lifting and transport for the staging and assembly of turbine components for the Dogger Bank Wind Farm. Dogger Bank Wind Farm is a joint venture between SSE Renewables, Equinor and Vårgrønn. Mammoet will employ multiple lifting and transport crews for simultaneous operations to support with the loading of equipment and tower assembly in the marshalling harbor, a key piece in constructing the project. The team will utilize cranes and self-propelled modular transporter... ... More: Official Press Release GE Renewable Energy
- Keywords:
- GE Renewable Energy, Mammoet, lifting, crane, Dogger Bank, offshore, wind far, onshore, Able Seaton Port, blade, nacelle, tower