Posted by: Windfair Editors
RWE finishes construction of El Algodon Alto wind farm in the U.S.
Official Press Release RWE:
RWE’s onshore wind farm El Algodon Alto in the U.S. in operation
200 megawatts onshore wind facility located near Texas coast / Project has the ability to supply more than 60,000 US homes with green energy / More than $11.1 million spent locally during construction
RWE Renewables’ El Algodon Alto, a 200-megawatt (MW) onshore wind farm, located in San Patricio County, Texas, is in operation. The project, located in the Electric Reliability Council of Texas (ERCOT) south market, is powered by 91 Vestas turbines and will generate enough electricity to power more than 60,000 homes. In total, the project spent more than $11.1 million locally during the construction period. With the addition of El Algodon Alto, RWE will have delivered a total installed generation capacity of more than 3,700 MW of wind power online in the state of... ... More: Official Press Release RWE
- Keywords:
- RWE, onshore, Texas, USA, coast, wind farm, operations, construction, investment