2024-04-18
http://w3.windfair.net/wind-energy/news/37032-ge-renewable-energy-uk-offshore-rotor-blade-factory-plant-teesside-dogger-bank-haliade-x-turbine-platform-manufacturing-facility-government

UK: GE Renewable Energy to Build New Rotor Blade Manufacturing Facility

Image: GE Renewable EnergyImage: GE Renewable Energy
LM Wind Power plans to open and operate a new manufacturing plant for the production of offshore wind turbine blades in Teesside, UK.

Official Press Release GE Renewable Energy:

GE Renewable Energy plans to open new offshore wind blade manufacturing plant in Teesside, United Kingdom

Wind Industry Profile of
GE Renewable Energy plans to open new offshore wind blade manufacturing plant in Teesside, United Kingdom

LM Wind Power plans to open and operate a brand-new manufacturing plant for the production of offshore wind turbine blades, due to open and start production in 2023 / The manufacturing facility could create 750 direct renewable energy jobs and close to 1,500 indirect jobs in the area / The facility would address the needs of the strong offshore wind market in the UK / The Dogger Bank Offshore Wind Farm, which features GE’s Haliade-X offshore wind platform, would directly benefit from the blades produced

GE Renewable Energy announced today that it plans to open a new blade manufacturing facility in Teesside in the North East of England. LM Wind Power plans to set up and operate this plant which will be dedicated to the production of its... ... More: Official Press Release GE Renewable Energy

Keywords:
GE Renewable Energy, UK, offshore, rotor blade, factory, plant, Teesside, Dogger Bank, Haliade-X, turbine, platform, manufacturing facility, Government







Thematically suitable Windfair.net members in the business directory

  • Newlist_kaeufer_logo
  • Newlist_logo.drakawind

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020