2024-03-19
http://w3.windfair.net/wind-energy/news/32855-dominion-energy-usa-offshore-boem-key-determination-design-fabrication-installation-cvow-virigina-orsted

BOEM Greenlights Dominion Energy' Offshore Wind Project

Image: Dominion EnergyImage: Dominion Energy
The Coastal Virginia Offshore Wind Project is on track for a summer 2020 installation.

Official Press Release Dominion Energy:

Dominion Energy receives key approvals for Coastal Virginia Offshore Wind project

Bureau of Ocean Energy Management finds favorable determination to two filings / Coastal Virginia Offshore Wind turbines on track for summer 2020 installation

Dominion Energy has received two key determinations from the Bureau of Ocean Energy Management (BOEM) regarding the design, fabrication and installation of the Coastal Virginia Offshore Wind (CVOW) project. “This is a significant milestone as we move forward on building the first-ever fully permitted offshore wind project in federal waters,” said Mark D. Mitchell, Dominion Energy’s vice president of generation construction.” This process will provide... ... More: Official Press Release Dominion Energy

Keywords:
Dominion Energy, USA, offshore, BOEM, key determination, design, fabrication, installation, CVOW, Virigina, Orsted







Thematically suitable Windfair.net members in the business directory


more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020