2024-11-21
http://w3.windfair.net/wind-energy/news/26929-ge-renewanle-energy-haliade-merkur-offshore-transport-nacelle

Last Shipment Off to Merkur Wind Farm

GE Renewable Energy has announced the departure of the last set of nacelles to Merkur's Offshore Windfarm for this year

Official Press Release GE Renewable Energy:

One third of 66 GE Haliade 150-6MW nacelles depart for Merkur Offshore windfarm

Wind Industry Profile of
One third of 66 GE Haliade 150-6MW nacelles depart for Merkur Offshore windfarm

Complex logistical dance needed to complete project by 2018 remains on-track / When completed Merkur will be one of Germany's largest offshore wind farms / Project will power around 500,000 homes and cut CO2 emissions significantly.

GE Renewable Energy announces the depart of the last set of nacelles to be shipped this year to Merkur's Offshore Windfarm logistical hub in Eemshaven Netherlands. By the end of the month this hub will have received 24 nacelles, 24 blades, and several other tower fragments and transition pieces. With all these component in-place, local teams will perform some pre-assembly works while getting prepared for the installation phase that is set to begin mid-February 2018. The offshore turbines have three main components – nacelles,... ... More: Official Press Release GE Renewable Energy

Keywords:
GE Renewanle Energy, Haliade, Merkur, offshore, transport, nacelle







Thematically suitable Windfair.net members in the business directory

  • Newlist_kaeufer_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020