Among the other listed companies in the Renewable Energy Equipment industry are First Solar from the USA and runner-up Gamesa CT from Spain
The wind power order has been placed by Sea Spa, a company controlled by Repower which is a leading Swiss utility generating electricity at its own plants in Switzerland, Italy and Germany
Dr. Rangarajan leads a global research team and a network of strategic partners on a mission to significantly reduce the cost of wind energy through industry-leading innovation
Outlook maintained - profit in line with expectations - safety improved once again.
Vestas has received a firm and unconditional order for 112 V100-1.8 MW wind turbines for the USA.
Vestas has received a firm and unconditional order for two projects in Spain with a total capacity of 92 MW.
The wind power order for 26 wind turbines of the V100-1.8 MW is for the Vandiya Power Wind Farm project in the state of Gujarat, India
UK Energy Minister Chris Huhne will visit Vestas' brand new €60 million wind power test centre at West Medina Mills on the Isle of Wight in the UK
Vestas has secured a wind power service contract extension for 57 wind turbines of the V90-2.0 MW turbine representing a total capacity of 114 MW for wind farm plants
Vestas has received a wind power order for a total capacity of 90 MW for wind farm projects in Brazil
New Brussels office to strengthen Vestas’ EU stakeholder relationships and EU presence
Wind energy Vestas has signed a wind turbines order for a total capacity of 60 MW for wind farm projects in Brazil
The order has been placed by REM Generación Electrica Mexicana (REM), a Mexican company established for this purpose
Wind turbines that do not interfere with radar systems used by aircraft may soon become a commercially viable option for the wind power industry, Danish turbine manufacturer Vestas said
Vestas receives wind power order in China for 58 V60-850 kW wind turbines for a wind farm
Plant Siting & Forecasting in Technology R&D will use new super computer to determine various factors and predicting the output of the operational wind farm on an hour to day-ahead basis
Vestas accelerates business growth and propels innovation in wind power solutions with opening of new hub in Singapore
Blue Canyon I includes 45 Vestas model NM72 wind turbines at 1.65 MW each which began producing energy in 2003
83 V90-1.8 MW turbines for a wind-energy project in Canada
Insight into a new generation of efficient and fully grid compliant 2 MW wind turbines for optimal performance across all wind classes and wind farm site conditions
Performance gains for the latest 2 MW turbine are achieved by its more efficient, upgraded drivetrain, improved load management system and full scale converter-based power system
Keyword Search