2024-11-24
http://w3.windfair.net/wind-energy/pr/44393-abo-wind-tricera-energy-battery-storage-facility-solar-farm-hybrid-combination-germany-capacity

News Release from ABO Energy KGaA

List_logo_aboenergy

Wind Industry Profile of


ABO Wind and TRICERA energy set new standard in sustainable battery storage systems

ABO Wind and TRICERA energy are jointly constructing three battery storage projects in Germany. The total capacity of the batteries amounts to more than 25 megawatt hours. They will be commissioned in the course of 2023 in combination with photovoltaic plants with an installed total capacity of 20.4 megawatt peak (MWp).

The solar farms are located in the municipalities of Weichenried (Bavaria), Euskirchen Wüschheim (North Rhine-Westphalia) and Wald-Michelbach (Hesse). ABO Wind had secured tariffs in innovation tenders from the Federal Network Agency for all three hybrid projects combining photovoltaics and battery storage to ensure economic operations.

The special feature of the battery storage is that it only comprises modules from the automotive sector. TRICERA energy has developed special technical solutions for this purpose. These enable the efficient electro-technical and control integration of different battery modules. The batteries are placed in eight 20-foot containers.

"The automotive sector, as a key user of lithium-ion batteries, will drive the development of high-quality battery packs in the next decade," says Dr Julia Badeda, Division Manager for Hybrid Energy Systems and Storage at ABO Wind. "With these projects, we are gaining valuable experience as a developer of stationary storage systems for the large-scale application of automotive packs in first- or second-life."

"With the concept pursued in this project, we are creating sustainability in several dimensions," says Dr Tim Müller, Managing Director of TRICERA energy. "By installing battery storage systems, we enable the expansion of further renewable energy plants and thus the success of the energy transition. At the same time, we are preparing for the time when used batteries from electric vehicles can be reused on a large scale. With our concept, we will extend the life cycle of the batteries and increase their added value. In addition, we gain time and only recycle the batteries when the corresponding recycling processes are fully developed. This significantly improves the recovery of the raw materials used."

Source:
ABO Wind
Author:
Press Office
Link:
www.abo-wind.com/...
Keywords:
ABO Wind, TRICERA energy, battery, storage, facility, solar farm, hybrid, combination, Germany, capacity



All news from ABO Energy KGaA

List_logo_aboenergy

news in archive


Thematically suitable Windfair.net members in the business directory

  • Newlist_logo_aboenergy
  • Newlist_juwi_logo_mit_verlauf_digital_srgb
  • Newlist_logo.overspeed
  • Newlist_wpd-logo
  • Newlist_statkraft_logo
  • Newlist_energiequelle_logo
  • Newlist_eno_energy_ogo_claim
  • Newlist_umweltbank_logo-2024-claim_mit-schutzzone
  • Newlist_logo.mesalands
  • Newlist_logo.otti
  • Newlist_ge_vernova_standard_rgb_evergreen
  • Newlist_logo.argentinaeolica.org
  • Newlist_logo.stahlwille
  • Newlist_profecventus
  • Newlist_pavana_logo_rgb_pfade_
  • Newlist_anemos_logo_neu
  • Newlist_geonet_logo
  • Newlist_logo.ammonit
  • Newlist_dynamica_ropes_logo_600x200
  • Newlist_bmu_logo
  • Newlist_irena_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020