2024-11-23
http://w3.windfair.net/wind-energy/pr/41131-nordex-colombia-turbine-manufacturer-wind-farm-onshore-celsia-colombia-mw-service-maintenance-concrete-tower-hub-height-latin-america

News Release from Nordex SE

No_logo

Wind Industry Profile of


Nordex SE: Nordex Group receives orders for 369 MW from Colombia

The Nordex Group wins orders in Colombia: Celsia Colombia S.A., an electricity producer and distributor, has ordered 63 N155 turbines with a total of 369 MW for three projects. The orders also include a Premium Service contract for maintenance of the turbines for a period of five years with an option to extend by a further five years.

The Acacia II and Camelias wind farms will be built in the Guajira region, and the Carreto project in Atlantico, all of them in the north of Colombia. Two N155/4.8 turbines are to be used in the Carreto wind farm, 16 N155/5.X in Acacia II and 45 N155/5.X machines in Camelias. 

Installation is due to commence as of spring 2023. The 63 turbines will be installed on concrete towers with a hub height of 120 metres, which will be manufactured locally by the Nordex Group. 

Patxi Landa, CSO of the Nordex Group: “In the last years, Colombia has been developing to a new key country in Latin America for the Nordex Group. We will now work closely with Celsia to help them to achieve their goals at their first wind energy project in Colombia.” 

When the wind farms are completed in 2023 the Nordex Group will be able to boast installed capacity in Colombia totalling 594 MW. In 2020 the Nordex Group 2020 received a 205 MW order for the supply and installation of 41 N149/4.X turbines.  

Marcos Cardaci, VP Region Latin America of the Nordex Group: “We thank Celsia for the trust placed in Nordex and our technology and we trust in the great future of the Colombian market”. 

In Colombia 70% of electricity comes from hydroelectric power and 29% from fossil-fuelled power plants. In order to meet the increasing demand for electricity in the country and to reduce the risk of outages – also caused by periods of drought – the Colombian government plans to diversify the energy mix by the increasing the use of wind power. 

Source:
Nordex
Author:
Press Office
Link:
www.nordex-online.com/...
Keywords:
Nordex, Colombia, turbine manufacturer, wind farm, onshore, Celsia Colombia, MW, service, maintenance, concrete tower, hub height, Latin America



All news from Nordex SE

No_logo

news in archive


Thematically suitable Windfair.net members in the business directory

  • Newlist_peikko_logo
  • Newlist_eno_energy_ogo_claim
  • Newlist_ge_vernova_standard_rgb_evergreen
  • Newlist_bwts_logo_2021
  • Newlist_xervon_engl_logo
  • Newlist_wpd-logo
  • Newlist_deutsche_windtechnik_logo
  • Newlist_prysmian_logo_rgb
  • Newlist_hoffmeier_logo_links_172_1820x_
  • Newlist_rts_wind_ag_logo_652x312px
  • Newlist_logo.hodijcoatings
  • Newlist_mpt_logo
  • Newlist_schaeffler_logo
  • Newlist_logo.tuev-sued-offshore
  • Newlist_windrad_logo-1-rgb
  • Newlist_logo.leitwind
  • Newlist_logo.engr.wisc
  • Newlist_hailo_wind_systems_logo_alternativ_grau
  • Newlist_woelfel_logo
  • Newlist_logo.overspeed
  • Newlist_unternehmenslogo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020