News Release from DEME Offshore
Wind Industry Profile of
DEME Offshore awarded Transport & Installation contract for Hollandse Kust (noord) and (west Alpha) offshore substations
The contract (1) has been awarded by the joint venture ENGIE Solutions-Iemants (a subsidiary of Smulders) that is responsible for the engineering, procurement, construction and offshore installation of the two substations.
Installation of the scour protection and jacket for Hollandse Kust (noord) is planned for the second half of 2021, while the topside for Hollandse Kust (noord) and jacket for (west Alpha) will be installed during the summer of 2022. The topside for Hollandse Kust (west Alpha) will be installed in 2023.
The offshore substations will be located in the Dutch North Sea. 40% of the Netherlands’ electricity needs will come from offshore wind farms by 2030. TenneT will realise the grid connections for these wind farms.
Bas Nekeman, Business Unit Director at DEME Offshore, comments: “We are very pleased with the trust one of the most experienced leaders in offshore substation construction has again placed in DEME Offshore. The combination of ENGIE Solutions-Iemants’ extensive know-how, combined with our expertise in tailored solutions for the offshore wind industry, has proven to be successful in the past few years when we have worked closely together to achieve challenging projects such as the SeaMade and Moray East offshore wind farms.”
Project Hollandse Kust (noord) (west Alpha)
The offshore platforms Hollandse Kust (noord) and Hollandse Kust (west Alpha) platforms will be located in the North Sea along the Dutch coast and will be operational by respectively 2023 and 2024. In 2030, 40 percent of the electricity demand of the Netherlands will be supplied by the electricity of offshore wind farms. TenneT realises the grid connections for these wind farms. These 700 MW platforms will be the fifth and sixth large-scale grid connections for offshore wind energy in the Netherlands, built and operated by TenneT. The first high-voltage connections for the wind farms near Borssele are now operational, and will be followed by the connections for Hollandse Kust (zuid) in 2022. TenneT will realise approximately 9.6 GW of high-voltage connections in the Dutch North Sea by 2030. For more information about the Net Op Zee programme of which these connections are part: https://www.netopzee.eu
(1) For DEME, a “contract” refers to a contract with a value less than EUR 50 million.
- Source:
- DEME
- Author:
- Press Office
- Link:
- www.deme-group.com/...
- Keywords:
- DEME, Netherlands, substation, offshore, wind farm, transport, installation, topside, jacket, Hollandse Kust, scour protection