News Release from Van Oord Dredging and Marine Contractors BV.
Wind Industry Profile of
Van Oord’s heavy lift installation vessel Svanen has arrived at Kriegers Flak wind farm
Kriegers Flak Offshore wind farm
Van Oord entered into an agreement with Vattenfall for the transport and installation of the foundations for Kriegers Flak wind farm. Van Oord will install the 72 monopiles and transition pieces. With a production capacity of just over 600 MW, Kriegers Flak will be Denmark’s largest offshore wind farm and is scheduled to be fully operational in 2021. The Danish Kriegers Flak Offshore wind farm is constructed in the Baltic Sea across a range of 15 to 40 kilometres from the Danish coast.
Transport and installation
The monopiles of up to 800 tonnes will be transported floating from Rostock, Germany, directly to the offshore site. The transition pieces will be transported on barges from Aalborg, Denmark. A noise mitigation system will be used to reduce the underwater noise resulting from offshore pile driving. In April, Van Oord’s subsea rock installation vessel Bravenes started the installation of the seabed protection.
New opportunities for the Svanen in the Baltic Sea
Van Oord’s 8,000-tonne lift installation vessel Svanen provides a cost-effective solution for its clients. So far, the vessel has installed approximately 650 foundations throughout Europe, of which the vast majority of monopiles in the Baltic Sea including the Anholt, Baltic 2 and Arkona projects. More wind farm projects are expected to be launched in the Baltic in the near future.
- Source:
- Van Oord
- Author:
- Press Office
- Link:
- www.vanoord.com/...
- Keywords:
- Van Oord, Kriegers Flak, offshore, Denmark, wind farm, instalation vessel, Baltic Sea, transport, foundation, capacity, monopile, transition piece, Svanen