2024-11-21
http://w3.windfair.net/wind-energy/pr/33162-nexans-vestas-turbine-cable-partnership-global-cable-kit-levelized-costs-time-to-market

News Release from Nexans Deutschland GmbH

No_logo

Wind Industry Profile of


Nexans expands its global wind turbine cabling partnership with Vestas Wind Systems

The two-year contract will see Windlink® medium voltage (MV) and low voltage (LV) cable kits installed inside Vestas wind turbines around the world / In the framework of the resident engineer programme, Nexans is working alongside Vestas on reducing levelized cost of energy and improving time-to-market for new turbines

Nexans has secured a two-year global supply contract to provide Vestas Wind Systems with Windlink® cable kits for onshore wind turbines in Europe, the US and China. This latest agreement extends Nexans’ long-standing position as a global supplier for Vestas.

As the countries continue the shift towards renewable energy sources, the global installed capacity for wind energy reached 591 GW in 2018 and is expected to grow further in the coming years[1]. Over 100 GW of the global installed capacity is provided by Vestas wind turbines operating in over 80 countries worldwide, establishing the company as an undisputed market leader.

As a long-term partner of Vestas Wind Systems, Nexans has been supplying Vestas with pre-assembled MV cable kits for the wind turbine main power circuit, ready-to-install LV cables and cable assemblies for nacelle and tower as well as power accessories such as connectors and surge arrestors. In the framework of the new two-year contract, Nexans will build on its global industrial footprint to supply MV and LV cable kits from hubs close to Vestas operations in Europe, China, the USA and Brazil.

In parallel, Nexans has launched a resident engineer programme with Vestas. In the framework of this programme, Nexans has been working hand-in-hand with Vestas teams to reduce levelized cost of energy (LCOE) and allow Vestas’ customers to achieve the best possible return on investment (ROI). Thus, Nexans has helped Vestas optimise cabling engineering and design time in order to reduce LCOE by accelerating the time-to-market for new more performant turbines.

“As one of the key actors of the energy transition, we are proud to support Vestas in its mission of bringing new sustainable energy solutions to power a brighter future,” Julien Hueber, Nexans Executive Vice President – Industry Solutions & Projects, said. “This global contract is the perfect illustration of the New Nexans’ industrial ambition. Building on our legacy as a cable manufacturer, we seek to team up with our clients and help them design more efficient solutions for the key challenges of today.”

 

[1] Global Wind Energy Council, Global Wind Report 2018, April 2019

Source:
Nexans
Author:
Press Office
Link:
www.nexans.com/...
Keywords:
Nexans, Vestas, turbine, cable, partnership, global, cable kit, levelized costs, time-to-market



All news from Nexans Deutschland GmbH

No_logo

news in archive


Thematically suitable Windfair.net members in the business directory

  • Newlist_roxtec-logo
  • Newlist_logo.weigt
  • Newlist_schaeffler_logo
  • Newlist_logo.helukabel
  • Newlist_3m_rgb
  • Newlist_prysmian_logo_rgb
  • Newlist_lap_logo
  • Newlist_klauke-logo
  • Newlist_peikko_logo
  • Newlist_xervon_engl_logo
  • Newlist_logo.mersen
  • Newlist_logo.fluid-bag
  • Newlist_akzonobel_logo_rgb_blue
  • Newlist_rsk.logo
  • Newlist_logo.steute-schaltechnik
  • Newlist_logo_phoenix_contact_100jahre_300x200_00148485
  • Newlist_pilz_logo
  • Newlist_windfair_logo_pos
  • Newlist_wfo_logo_new

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020