02/22/2011
USA - CCI/Ryan To Erect Alstom Wind Turbines In Minnesota
Carstensen Contracting Inc. and Ryan Companies US Inc. (CCI/Ryan) has been selected to erect Alstom-manufactured wind turbines for the 20 MW Danielson wind farm, located near Atwater, Minnesota.
The Alstom wind turbines have a generating capacity of 1.67 MW each and a design that is optimized for medium to low winds, according to the companies.
The CCI/Ryan team is responsible for construction of roads and foundations, installation of the collection system and erection of the wind turbines. The wind energy project began in late 2010 and is expected to be completed later this month.
For more information on this article or if you would like to know more about what www.windfair.us can offer, please do not hesitate to contact Errol Stryker at es@windfair.us
www.windfair.net is the largest international B2B Internet platform – ultimately designed for connecting wind energy enthusiasts and companies across the globe!
The Alstom wind turbines have a generating capacity of 1.67 MW each and a design that is optimized for medium to low winds, according to the companies.
The CCI/Ryan team is responsible for construction of roads and foundations, installation of the collection system and erection of the wind turbines. The wind energy project began in late 2010 and is expected to be completed later this month.
For more information on this article or if you would like to know more about what www.windfair.us can offer, please do not hesitate to contact Errol Stryker at es@windfair.us
www.windfair.net is the largest international B2B Internet platform – ultimately designed for connecting wind energy enthusiasts and companies across the globe!
- Source:
- Alstom
- Author:
- Posted by Trevor Sievert, Online Editorial Journalist
- Email:
- es@windfair.us
- Link:
- www.alstom.com/...
- Keywords:
- alstom, wind energy, wind power, wind turbine, onshore, offshore, windmill, www.windfair.net, Trevor Sievert, ECA