11/11/2022
Posted by: Windfair Editors
BRAUN Winturbinen busy installing new small wind turbines
Official Press Release BRAUN Windturbinen:
In Lower Saxony we are now busy installing!
Now that in Lower Saxony wind turbines up to 15m can be erected without a procedure (from 01.01.2022 in outdoor areas), one installation after the other is taking place......
Here the Antaris 7.5 kW on a 12m tipping mast. The system operates 3-phase parallel to the grid with the Smart!wind SW7.5, and as a backup heating system with a 6.0 kW heating rod. Enjoy the wind with Antaris wind turbines! ... More: Official Press Release BRAUN Windturbinen
- Keywords:
- Braun Windturbinen, small wind, Antaris, turbine, Lower Saxony, Germany, installation