2024-07-27
http://w3.windfair.net/wind-energy/news/39792-eneti-abb-offshore-wind-turbine-installation-vessel-safety-flexibility-emissions-next-generation-upgrade-demand-gw

ABB to equip Eneti's next-generation offshore wind turbine installation vessels

The new vessels’ capabilities will rely on ABB’s integrated automation, power and electric propulsion systems, including closed-ring and closed-bus solutions.

Official Press Release ABB:

ABB wins systems order for Eneti’s next-generation offshore wind turbine installation vessels

Wind Industry Profile of
ABB wins systems order for Eneti’s next-generation offshore wind turbine installation vessels

ABB secures order of around $27 million to supply Eneti’s two newbuild vessels with advanced power, automation and control systems for improved safety and performance / The vessels will support a fast-growing offshore wind market, in line with Eneti’s focus to build a meaningful and sustainable business in marine-based renewable energy / Hybrid battery power solution will be integrated to increase operational safety and flexibility while cutting emissions

The two $330 million wind turbine installation vessels (WTIV) will be delivered to Monaco-based offshore wind construction player Eneti Inc. from the South Korean shipyard Daewoo Shipbuilding & Marine... ... More: Official Press Release ABB

Keywords:
Eneti, ABB, offshore, wind turbine, installation, vessel, safety, flexibility, emissions, next generation, upgrade, demand, GW







Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.windfair-us
  • Newlist_logo.drakawind
  • Newlist_kaeufer_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020