Posted by: Windfair Editors
GE Renewable Energy’s 14 MW Haliade-X starts operating
Official Press Release GE Renewable Energy :
GE Renewable Energy’s Haliade-X prototype starts operating at 14 MW
GE’s Haliade-X prototype is now running at 14 MW / The Haliade-X 14 MW can produce up to 74 GWh* of gross annual energy production and is an uprated version of the Haliade-X 13 MW / GE Renewable Energy was the first industry player to start operating an offshore wind turbine in the 12 MW and above category back in November 2019
GE Renewable Energy announced today that its Haliade-X prototype in Rotterdam, a port city in the Netherlands, has started operating at 14 MW. With this new milestone, GE Renewable Energy becomes the first industry player to operate a turbine at this power output. The Haliade-X 14 MW is an uprated version of the Haliade-X 13 MW, which received its type certification in January 2021. The GE Renewable Energy team has now officially started... ... More: Official Press Release GE Renewable Energy
- Keywords:
- GE Renewable Energy, turbine, prototype, MW, capacity, wind farm, offshore, Rotterdam, Netherlands, output, production, operation, Haliade-X