2024-12-22
https://w3.windfair.net/wind-energy/news/38791-ge-renewable-energy-acta-marine-offshore-wind-farm-france-vessel-sov-service-operation-vessel-saint-nazaire

GE Renewable Energy and ACTA MARINE sign contract for SOV

GE Renewable Energy and ACTA MARINE have announced the signature of a supply contract for the chartering of a Service Operation Vessel (SOV) for the Saint-Nazaire offshore wind farm.

Official Press Release GE Renewable Energy:

GE Renewable Energy and ACTA MARINE sign contract for Saint-Nazaire offshore wind farm commissioning Service Operation Vessel

Wind Industry Profile of
GE Renewable Energy and ACTA MARINE sign contract for Saint-Nazaire offshore wind farm commissioning Service Operation Vessel

The Service Operation Vessel will support the GE Wind Turbines Mechanical Completion and Commissioning phase of the Saint-Nazaire offshore wind farm construction / The installation is anticipated to start in the second quarter of 2022 / The Saint-Nazaire offshore wind farm will be equipped with 80 Haliade 150-6MW and will have an installed capacity of 450 MW

GE Renewable Energy and ACTA MARINE announced today the signature of a supply contract for the chartering of a Service Operation Vessel (SOV) for the commissioning activities of 80 Haliade 150-6MW turbines at the Saint-Nazaire offshore wind farm (“Parc... ... More: Official Press Release GE Renewable Energy

Keywords:
GE Renewable Energy, ACTA MARINE, offshore, wind farm, France, vessel, SOV, service operation vessel, Saint-Nazaire







Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.drakawind

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020