2024-04-18
http://w3.windfair.net/wind-energy/news/38472-greenvolt-poland-wind-farm-construction-installtion-onshore-capacity-renewable-energy-developer

Construction start for two Polish onshore wind farms

Image: PixabayImage: Pixabay
Developer GreenVolt has started the construction of two wind farms in Poland with an installed capacity of 50 MW.

Official Press Release GreenVolt:

Greenvolt starts construction of wind farms in Poland

GreenVolt, through V-Ridium, will start the construction of two wind farms in Poland with an installed capacity of 50 MW.

The 15.4 MW Podlasek and 34.5 MW Wólka Dobrynska projects are expected to be operational by the end of 2022 and result from the third auction carried out by the Polish authorities. Podlasek Park is situated on the outskirts of Podlasek about 100km south of Gdansk. Wólka Dobrynska's parquet is located at about 18 km from Biala Podlaska, in the west of the country. The company selected Vestas as the supplier of the turbines that will equip both parks, a company that will also ensure their maintenance for a period of 30 years. Greenvolt has in pipeline about 2.8 GW of renewable energy production projects from sun... ... More: Official Press Release GreenVolt

Keywords:
GreenVolt, Poland, wind farm, construction, installtion, onshore, capacity, renewable energy, developer







Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.drakawind
  • Newlist_logo.windfair-us

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020