Posted by: Windfair Editors
First Order in Spain for GE’s Cypress Platform
Official Press Release GE Renewable Energy:
GE Renewable Energy signs first Cypress order in Spain
GE Renewable Energy selected by Azora to supply 19 Cypress onshore wind turbines units for the Cuevas de Velasco wind farm / The 100 MW project will use 158 meter-high rotors, the most powerful rotor ever permitted in Spain / Deal includes a 30-year service contract
GE Renewable Energy announced today that it has been selected by Azora to supply 19 Cypress onshore wind turbines for the 100 MW Cuevas de Velasco wind farm located in the Cuenca province in Spain. Azora will operate the Cypress turbines at 5.5 MW, with a rotor diameter of 158m, the most powerful ever permitted in Spain. This marks the first order in Spain for GE’s Cypress platform, the company’s largest onshore wind turbine in the field. GE’s scope of work will also include a 30-year... ... More: Official Press Release GE Renewable Energy
- Keywords:
- GE Renewable Energy, Spain, Cypress, turbine, platform, onshore, wind farm, service agreement, Azora, deal, Salzbergen, Germany, LM Wind Power, blade