2024-03-19
http://w3.windfair.net/wind-energy/news/33702-ulstein-offshore-vessel-bernhard-schulte-windea-floated-dock-harbour-sea-trial-yard-ge-renewable-energy-merkur-owf-germany

Ulstein Positions New Offshore Vessel Quayside

Image: Marius ErtesvågImage: Marius Ertesvåg
The Yard number 315 newbuild at Ulstein Verft, the Windea TBN for Bernhard Schulte, has been floated out from the outer dock

Official Press Release Ulstein:

Offshore wind vessel positioned quayside

Wind Industry Profile of
Offshore wind vessel positioned quayside

The Yard number 315 newbuild at Ulstein Verft, the Windea TBN for Bernhard Schulte, has been floated out from the outer dock and has now been positioned quayside. The vessel is now getting prepared for her first sea trial in early March.

Prior to the sea trial various tests will be carried out, including start-up of the propulsion system, testing of the tower and crane.The X-BOW® and X-STERN™ offshore wind vessel will be working as a Service Operation Vessel for GE Renewable Energy on the Merkur Offshore Wind Farm off the coast of Germany. Follow the progress of this hybrid vessel from design to delivery: ... More: Official Press Release Ulstein

Keywords:
Ulstein, offshore, vessel, Bernhard Schulte, Windea, floated, dock, harbour, sea trial, yard, GE Renewable Energy, Merkur, OWF, Germany







Thematically suitable Windfair.net members in the business directory

  • Newlist_kaeufer_logo
  • Newlist_logo.drakawind

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020