07/25/2019
Posted by:
Braun Windturbinen: Summer Hiatus Is Over
Official Press Release Braun Windturbinen:
The summer break is over again!
The Antaris 3.5 kW will be installed on a 12m lattice tower.
The plant works in Portugal (near the Atlantic) 1-phase grid-parallel with an ABB-UNO-DM-4.0-TL. The Power Curve Controller is installed in our control cabinet and provides the ABB inverter with the characteristic curve via RS485. If you still have questions to the project, then call us! Enjoying the wind with ANTARIS wind turbines. ... More: Official Press Release Braun Windturbinen
- Keywords:
- Braun Windturbinen, small wind, Portugal, lattice tower, summer break, control cabinet