2018-10-17
http://w3.windfair.net/wind-energy/news/28900-doc-offshore-inner-array-cable-installation-merkur-wind-farm-north-sea

Inner Array Cable Installation Finished at Merkur OWZ

All Images: DOCAll Images: DOC
DOC successfully supervises the inner array cable installation of the MERKUR Offshore wind farm in the German North Sea
Keywords:
DOC, offshore, inner array cable, installation, MERKUR, wind farm, North Sea

DOC successfully supervises the inner array cable installation of the MERKUR Offshore wind farm

Wind Industry Profile of
DOC successfully supervises the inner array cable installation of the MERKUR Offshore wind farm

Official Press Release DOC:

Cable production, installation, connection and testing

The successful cooperation between Deutsche Offshore Consult GmbH (DOC) and MERKUR Offshore GmbH began in 2016. In October 2017, DOC took over the responsibility for construction supervision of the inner array cable installation for the 400-MW offshore ... More: Official Press Release DOC







Corr Members

  • Newlist_logo.weigt
  • Newlist_prysmian_group_logo
  • Newlist_logo.seilpartner-gmbh
  • Newlist_logo.overspeed
  • Newlist_senvion-logo
  • Newlist_logo.owt
  • Newlist_logo.dnv-windenergy
  • Newlist_gewi
  • Newlist_logo.roxtec
  • Newlist_rts_wind_ag_logo_652x312px
  • Newlist_anemos_logo_neu
  • Newlist_woelfel_logo
  • Newlist_hauff-technik-w
  • Newlist_logo.dewi-occ
  • Newlist_logo.mesalands
  • Newlist_nordex_combined_logos
  • Newlist_tuev_nord_logo_blau
  • Newlist_logo.tuev-sued
  • Newlist_logo.minimax
  • Newlist_windrad_logo-1-rgb
  • Newlist_bmu_logo

more results



Search by Keywords

© smart dolphin Gmbh 1999 - 2018 | Legal Notice | Windfair Editors | Privacy Policy