2018-09-21
http://w3.windfair.net/wind-energy/news/28487-mmt-seabed-survey-aquind-interconnector-corridor

No Obstacles for AQUIND Interconnector

Image: MMTImage: MMT
MMT completes geophysical seabed survey for planned AQUIND Interconnector between the UK and France
Keywords:
MMT, seabed survey, AQUIND, interconnector, corridor

MMT completes geophysical seabed survey for AQUIND Interconnector

Official Press Release MMT:

MMT has recently completed a geophysical seabed survey and delivered the final report for the proposed AQUIND Interconnector offshore cable route.

MMT surveyed a corridor between Portsmouth in the UK and the coastal region of Dieppe in France. MMT utilised two vessels: M/V Franklin for offshore works and M/V Seabeam for nearshore works. Four cables, bundled as two pairs, will be installed along the surveyed route totalling approximately 190km in length. No major obstacles to the cable route were uncovered during the survey. The survey results will inform Environmental Impact Assessments in... ... More: Official Press Release MMT







Corr Members

  • Newlist_logo.weigt
  • Newlist_logo.wind-consult

more results



Search by Keywords

© smart dolphin Gmbh 1999 - 2018 | Legal Notice | Windfair Editors | Privacy Policy