2018-09-21
http://w3.windfair.net/wind-energy/news/28313-ges-nabrawind-prototype-tower-wind-turbine-installation-costs

GES Cooperates with Nabrawind for Installation of New Self-Erecting Tower Prototype

Image: GESImage: GES
The new tower will reduce installation costs
Keywords:
GES, Nabrawind, prototype, tower, wind turbine, installation costs

GES supports Nabrawind in the installation of its tower prototype

Official Press Release GES:

The tower prototype will validate a new design to reduce the turbine installation costs

GES is cooperating with Nabrawind in the installation of a new self-erecting tower prototype, patented by the Spanish engineering company. GES has taken part in the first assembly tests and is now in charge of the erection of the prototype, which will be 160 meter high, in Eslava (Spain). Nabrawind aims to validate the innovative... ... More: Official Press Release GES







Corr Members

  • Newlist_logo.advancedtowers
  • Newlist_logo.seilpartner-gmbh
  • Newlist_senvion-logo
  • Newlist_tuev_nord_logo_blau
  • Newlist_woelfel_logo
  • Newlist_plarad_logo
  • Newlist_logo.dmt
  • Newlist_logo.hardy-schmitz
  • Newlist_logo.cmcgmbh
  • Newlist_peikko_logo
  • Newlist_logo.aero_dynamik_consult
  • Newlist_logo.owt
  • Newlist_windeurope_primary_rgb
  • Newlist_pilz_logo
  • Newlist_prysmian_group_logo
  • Newlist_ge_net_logo
  • Newlist_logo.lincoln
  • Newlist_reyher
  • Newlist_logo.engr.wisc
  • Newlist_logo.windkraft-gutachten
  • Newlist_hailo_wind_systems_logo_alternativ_grau

more results



Search by Keywords

© smart dolphin Gmbh 1999 - 2018 | Legal Notice | Windfair Editors | Privacy Policy