Posted by: Windfair Editors
GES Cooperates with Nabrawind for Installation of New Self-Erecting Tower Prototype
Official Press Release GES:
GES supports Nabrawind in the installation of its tower prototype
The tower prototype will validate a new design to reduce the turbine installation costs
GES is cooperating with Nabrawind in the installation of a new self-erecting tower prototype, patented by the Spanish engineering company. GES has taken part in the first assembly tests and is now in charge of the erection of the prototype, which will be 160 meter high, in Eslava (Spain). Nabrawind aims to validate the innovative design, that will make possible a dramatic- decrease in the tower erection costs. The use of a modular self-erecting system avoids the big cranes' costs currently used in r the installation of the tallest wind turbines. GES has been a pioneer in the renewable sector and is always aware of the new trends in the industry, adapting its services... ... More: Official Press Release GES
- Keywords:
- GES, Nabrawind, prototype, tower, wind turbine, installation costs