2018-10-23
http://w3.windfair.net/wind-energy/news/27574-van-oord-aeolus-vessel-crane-installation-vessel-foundation-turbine

Van Oord's Aeolus Fitted with Gigantic Crane

Image: Van OordImage: Van Oord
The crane makes the vessel ready to handle the latest generation of foundations and turbines for offshore wind projects.
Keywords:
Van Oord, Aeolus, vessel, crane, installation vessel, foundation, turbine

Aeolus fitted with impressive new crane

Official Press Release Van Oord:

Today, a major step was taken in the modification of Van Oord’s offshore installation vessel Aeolus. The new 1,600 tonnes crane was successfully installed onboard, making the vessel ready to handle the latest generation of foundations and turbines for offshore wind projects.

The crane, designed and built by Huisman, was installed by Heerema’s Thialf. The leg encircling crane is built around the portside aft jack-up leg and the boom is stored around the forward leg, saving valuable deck space. The new crane can lift almost twice as much as the Aeolus’ previous crane. The modification of... ... More: Official Press Release Van Oord







Corr Members

  • Newlist_logo.weigt
  • Newlist_senvion-logo
  • Newlist_peikko_logo
  • Newlist_plarad_logo
  • Newlist_logo.wka-bs
  • Newlist_weidm_ller_ob_rgb
  • Newlist_logo.hawe
  • Newlist_demag__company_logo_rgb_300dpi_20cm-1
  • Newlist_logo.graewe
  • Newlist_logo.wkaservice
  • Newlist_nordex_combined_logos
  • Newlist_logo.windkraft-gutachten
  • Newlist_logo.minimax
  • Newlist_logo.cmcgmbh
  • Newlist_logo.engr.wisc
  • Newlist_livetwlogoonwhite
  • Newlist_prysmian_group_logo
  • Newlist_ge_net_logo
  • Newlist_logo.mts
  • Newlist_logo.schraubenwerk

more results



Search by Keywords

© smart dolphin Gmbh 1999 - 2018 | Legal Notice | Windfair Editors | Privacy Policy