Posted by:
All Good at Greater Gabbard
Official Press Release Altitec:
Altitec Carries Out Specialist Healthcheck At Greater Gabbard
Global blade inspection specialist completes in situ maintenance work and lightning repairs at 504MW offshore wind farm.
Altitec, the global blade inspection and maintenance specialist, has completed lightning damage inspection and repairs at the Greater Gabbard Offshore Wind Farm, as part of its maintenance work at the site. The work this summer followed end of warranty (EOW) inspections carried out last year, and featured two teams operating on-site over a period of six weeks. Wind turbines are susceptible to lightning damage due to their height and high conductivity, and lightning strikes can contribute to a loss of productivity and periods of downtime. On average, Altitec estimates that it carries out lightning repairs on up to 4% of the turbine blades it inspects... ... More: Official Press Release Altitec
- Keywords:
- Altitec, healthcheck, Greater Gabbard, offshore, UK, blades