2024-12-22
https://w3.windfair.net/wind-energy/news/22931-first-monopiles-arrived-at-sif-assembly-facility

News Release from windfair.net

List_windfair_logo_pos

Wind Industry Profile of


First monopiles arrived at Sif assembly facility

On 4 September 2016, the first sections for monopiles arrived at the new Sif assembly facility in Rotterdam.

These sections were produced in Roermond and shipped to Rotterdam where they will be welded together into monopiles. The first of the monopiles produced in Rotterdam are made for the Galloper Offshore Wind Farm in the North Sea off the coast of England. The production of these monopiles is scheduled to start in the fourth quarter of 2016. 

 

Source:
Sif
Link:
www.sif-group.com/...
Keywords:
Sif, Rotterdam, Netherlands, assembly facility



All news from windfair.net

List_windfair_logo_pos

news in archive


Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.drakawind

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020