2024-11-22
http://w3.windfair.net/wind-energy/news/22778-bligh-bank-phase-2-substation-ready-for-installation

News Release from windfair.net

List_windfair_logo_pos

Wind Industry Profile of


Bligh Bank Phase 2 substation ready for installation

The Bligh Bank Phase 2 substation is now finalised and this weekend load-out took place at Bladt Industries’ production facilities in Aalborg.

Construction of the substation was initiated in May 2015 and as head entrepreneur on the EPCI project, Bladt Industries is responsible for the construction of steel, as well as the design, fabrication, commissioning and installation of the substation. Total weight of the substation is 1,100 tons.

Bladt Industries collaborates with Semco Maritime and ISC throughout the design process, onshore construction, as well as offshore commissioning of electrics and technical systems.

The project has progressed according to schedule and Bladt Industries is very pleased with the result. Cooperation with Semco Maritime has been yet another success and the substation project has been finalised on a short 3 months. Installation will take place mid-September 2016.

The substation will be placed in Belwind offshore wind farm in the North Sea, 45 kilometres off the coast of Belgium where it will collect voltage from 50 wind turbines.

Source:
Bladt Industries
Link:
www.bladt.dk/...
Keywords:
Bladt Industries, substation, Belwind, offshore, offshore wind farm, Northsee, Belgium



All news from windfair.net

List_windfair_logo_pos

news in archive


Related News

Thematically suitable Windfair.net members in the business directory


more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020