2024-12-22
https://w3.windfair.net/wind-energy/news/16611-nordex-receives-follow-on-order-from-impax

News Release from Nordex SE

No_logo

Wind Industry Profile of


Nordex receives follow on order from Impax

Contract signed for 51-MW “KUKE” wind farm with 17 x N117/3000 turbines from the Delta generation

The financial investor Impax Asset Management has placed a second order with Nordex to build a wind farm in Finland. The Kuolavaara-Keulakkopää project (“KUKE”) is being constructed in Finnish Lapland and will comprise 17 N117/3000 Delta machines especially designed for these regions with their medium-strength winds. In order to cope with the cold weather conditions at this site the rotors will be fitted with a special anti-icing system, which will significantly increase the technical availability of the turbines and thus ensures higher yields and a higher financial return.

Turbine installation work at the site will start in spring 2015. The wind farm is due to be connected to the grid and begin feeding in green electricity in during 2015. Impax has also concluded a Premium Service Agreement with Nordex initially for five years with a view to ensuring that the yield level is maintained over the long term.

Nordex is currently installing turbines at the first wind farm for Impax in Finland. This is the “Joukhaisselkä” project with an installed capacity of 27 megawatts, which will consist of nine turbines from the same series.

 

Source:
Nordex
Email:
info@nordex-online.com
Link:
www.nordex-online.com/...



All news from Nordex SE

No_logo

news in archive





Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020