2024-11-05
http://w3.windfair.net/wind-energy/news/10192-czech-republic-wind-energy-development-slower-than-planned

Czech Republic - Wind energy development slower than planned

By the end of this year, wind farm plants with a total output between 8MW and 10 MW are planned to be built

The construction of wind farm plants in the Czech Republic is stagnating as the combined output of new units rose by only 1.3MW in January to November 2011, CTK newswire reported citing Michal Janecek, head of the Czech Wind Energy Association (CSVE).

The country's national plan for renewable sources envisages annual growth of 50 MW in order to meet the goal of having 743 MW generated from renewables by 2020. The country aims to produce 13% of energy from renewable sources by 2020.

By the end of this year, wind power plants with a total output between 8MW and 10 MW are planned to be built. In a separate statement, CTK reported that power generated from renewable sources met 8.32% of the domestic consumption in 2010, in line with the government's target. In 2010, power generation from renewable sources grew by 27% y/y.

For more information on this article or if you would like to know more about what www.windfair.net can offer, please do not hesitate to contact Trevor Sievert at ts@windfair.net

www.windfair.net is the largest international B2B Internet platform – ultimately designed for connecting wind energy enthusiasts and companies across the globe!

Source:
Online Editorial www.windfair.net
Author:
Posted by Trevor Sievert, Online Editorial Journalist
Email:
ts@windfair.net
Link:
www.windfair.net/...
Keywords:
wind, wind energy, wind turbine, rotorblade, awea, ewea, wind power, suppliers, manufacturerstrevor sievert




Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.windfair-us
  • Newlist_kaeufer_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020