2017-10-18
http://w3.windfair.net/wind-energy/news/25640-hutchinson-load-out-mhi-vestas-blade

Hutchinson Engineering Ltd has sent out its first load of Root & Tip Blade frames for MHI Vestas in Denmark

Image: Hutchinson Engineering Ltd.Image: Hutchinson Engineering Ltd.
First load out from new quayside facility alongside Garston Dock on the River Mersey
Keywords:
Hutchinson, load out, MHI Vestas, blade

Official Press Release Hutchinson Engineering Ltd:

Hutchinson First Load-out at the New Garston Dock Facility

Garston Load out for MHI Vestas

Last Thursday the MV Ingeborg set sail to Denmark with 7 sets of Root & Tip Blade frames ordered for the MHI Vestas V164 Turbine Blade global deployment programme. These 6m x 4m units weighing up to 25te were fabricated, finally assembled with components also manufactured at the nearby Widnes plant. The Project included on site shot blast and painting at Hutchinson’s new quayside facility alongside Garston Dock on the River Mersey. This was the first... ... More: Official Press Release Hutchinson Engineering Ltd





Leave a Comment! No login necessary




Search by Keywords

© smart dolphin Gmbh 1999 - 2017 | Legal Notice | Windfair Editors