2024-04-18
http://w3.windfair.net/wind-energy/pr/31781-braun-windturbinen-antaris-small-wind-mast-allgau-installation-authority-agriculture-farm

News Release from BRAUN Windturbinen GmbH

List_braun_windturbinen_logo

Wind Industry Profile of


Also in the Allgäu one is happy about the Antaris wind turbines!

The Antaris 10 kW was built on a 15m mast.

Image: BRAUN WindturbinenImage: BRAUN Windturbinen

According to the building authority the mast had to be shortened from 18m to 15m, including the colour specification. One can certainly discuss the sense of this edition, but well.
The Antaris works here 3-phase mains parallel and supplies the agricultural enterprise with clean electricity.

Our thanks also go to the electrical installation company: https://www.langhof-seeg.de/

If you have any questions about the project, please give us a call!

 

Enjoying the wind with ANTARIS wind turbines.
For more pictures, please visit the homepage.

Source:
BRAUN Windturbinen
Author:
Press Office
Link:
www.braun-windturbinen.com/...
Keywords:
Braun Windturbinen, Antaris, small wind, mast, Allgäu, installation, authority, agriculture, farm



All news from BRAUN Windturbinen GmbH

List_braun_windturbinen_logo

news in archive


Thematically suitable Windfair.net members in the business directory

  • Newlist_braun_windturbinen_logo
  • Newlist_windhunter_service_2_
  • Newlist_geonet_logo
  • Newlist_logo.overspeed
  • Newlist_prysmian_logo_rgb
  • Newlist_logo.labkotec
  • Newlist_logo.thies
  • Newlist_anemos_logo_neu
  • Newlist_logo.weigt
  • Newlist_woelfel_logo
  • Newlist_sabowind_logo
  • Newlist_logo.engr.wisc
  • Newlist_minimax_logo
  • Newlist_sunbelt_logo
  • Newlist_logo.rotor-energy
  • Newlist_rts_wind_ag_logo_652x312px
  • Newlist_windrad_logo-1-rgb
  • Newlist_logo.otti
  • Newlist_ts_logo_rgb
  • Newlist_wieland_logo_4c_rgb

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020