Wind Energy Keyword: "setup"
Latest Wind Energy News
-
The Greater Changhua offshore wind farm will have a power generation capacity of 2.4 GW 04/18/2024 -
DHI to host test lab for floating wind turbines in the 20-MW class 11/01/2023 -
Vestas to strengthen digital transformation and Development business with new organisational setup and member of Executive Management 06/27/2022 -
SCADA International delivers complex control algorithms to EDPR's first hybrid project in Poland 08/29/2023 -
Mammoet-Giant Taiwan to provide support for the 920 MW Greater Changhua 2b and 4 OWF 08/02/2023 -
R&D Test Systems delivered world’s largest dual-axis blade exciter to US-based Massachusetts Clean Energy Center’s WTTC 06/27/2023 -
Facilities Expand U.S. Offshore Wind Energy Testing Capabilities 05/17/2023 -
Vestas to strengthen commercial setup and appoint Javier Rodriguez Diez to succeed Juan Araluce as Chief Sales Officer 06/01/2021 -
DEME Offshore and Liftra join forces to develop innovative offshore installation methodology for next generation of wind turbines 04/18/2023 -
DNV advises PGE Baltica on setup of a joint venture structure to develop, build and operate two offshore wind plants in the Baltic Sea 03/05/2021 - >> more results