2019-02-23
http://w3.windfair.net/wind-energy/pr/30546-iberdrola-cavar-complex-wind-farms-cluster-spain-installation-siemens-gamesa-turbines-medium-emissions-electricity

News Release from Iberdrola

No_logo

Wind Industry Profile of


Iberdrola to Build the Cavar Complex in Spain

The wind cluster will consist of four wind farms with an installed capacity of 111 megawatts

Image: IberdrolaImage: Iberdrola

The Cavar Complex is one of the largest wind farms developed in Spain by the energy supplier Iberdrola in recent years. It is a joint initiative by Iberdrola and Caja Rural de Navarra.

All four wind farms are located in the Cadreita and Valtieera municipal areas and will feature 32 SG 3.4-132 MW wind turbines by Siemens Gamesa. These turbines will be the largest used to date in a land-based wind farm in Spain. With blades measuring 64.5m and a rotor diameter of 132 m, this is the ideal model for sites with medium and high winds.

Building will start within a few months and the facilities are expected to go into service in 2020. The wind farm complex will generate enough energy to power 46,500 households/year and, because this is renewable energy, it will prevent emissions of 84,000 tonnes of CO2 every year.

Source:
Iberdrola
Author:
Windfair Staff
Email:
press@windfair.net
Keywords:
Iberdrola, Cavar Complex, wind farms, cluster, Spain, installation, Siemens Gamesa, turbines, medium, emissions, electricity



Alle Meldungen Von Iberdrola

No_logo

news in archive


Corr Members

  • Newlist_senvion_logo
  • Newlist_logo.awea
  • Newlist_nordex_combined_logos
  • Newlist_logo.kaeufer
  • Newlist_logo.drakawind
  • Newlist_logo.windfair-us
  • Newlist_logo.lufft
  • Newlist_logo.warensortiment

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2019 | Legal Notice | Windfair Editors | Privacy Policy