2024-04-19
http://w3.windfair.net/wind-energy/pr/27173-swan-hunter-van-oord-export-cable-offshore

Swan Hunter secure Van Oord Norther Export Cable Storage Project

Swan Hunter have secured the Norther Offshore Windfarm Export Cable storage contract for Van Oord. Transpooling operations to store the cable are planned to commence in Q2 2018.

Image: Swan HunterImage: Swan Hunter

“We are pleased to announce this contract award. The award of this second cable storage project highlights both the operational potential, and immediate client interest that we have received in our cable storage equipment and facility since opening the premises in November 2017," says Gerard Kroese, Director.

Approximately 29km of cable, weighing 3300 metric tons, will be transpooled from an HLV and stored in a Swan Hunter basket carousel at the DOC-Swan Hunter storage and spooling yard, Vlissingen, before loadout onto Van Oord’s CLV Nexus, currently planned for Q3 2018.

Source:
Swan Hunter
Author:
Press Office
Link:
swanhunter.com/...
Keywords:
Swan Hunter, Van Oord, export cable, offshore




Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.weigt
  • Newlist_roxtec-logo
  • Newlist_logo.helukabel
  • Newlist_prysmian_logo_rgb
  • Newlist_stiftung_offshorewind
  • Newlist_klauke-logo
  • Newlist_logo.druseidt
  • Newlist_logo.hydac
  • Newlist_bmu_logo
  • Newlist_now_logo
  • Newlist_bwts_logo_2021
  • Newlist_d_reb_logo
  • Newlist_owemes_logo
  • Newlist_braun_windturbinen_logo
  • Newlist_dynamica_ropes_logo_600x200
  • Newlist_logo.seaports
  • Newlist_logo.steute-schaltechnik
  • Newlist_bwo_logo
  • Newlist_ptmewlogo
  • Newlist_logo.overspeed

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020