2024-12-22
https://w3.windfair.net/wind-energy/pr/26794-bladt-industries-secures-additional-28-hornsea-transition-pieces

Bladt Industries Secures Additional 28 Hornsea Transition Pieces

Additional 28 transition pieces for the Hornsea Project One have been added to the manufacturing portfolio of Bladt Industries in Aalborg. Bladt Industries appreciates the confidence shown by Ørsted (previously DONG Energy) in placing the manufacturing of the additional TPs at the yard in Aalborg.

In total, Bladt Industries has now contracted 124 TPs on Hornsea Project One of which Bladt Industries currently fabricates 68 in Aalborg, Denmark. The remaining 56 TPs are subcontrated to EEW Offshore Structures Britain (EEW OSB) in the UK, of which EEW SPC recently acquired full ownership. The fabrication of the Hornsea TPs at EEW OSB will continue unchanged.

Bladt Industries continues to focus on UK projects, and will remain a strong strategic player in the offshore foundations market with a continued strong focus on the UK market and is currently working to optimise the future local UK content offerings.
 

Source:
Bladt Industries
Author:
Press Office
Link:
www.bladt.dk/...







Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020