2024-11-22
http://w3.windfair.net/wind-energy/pr/12439-chile-vestas-to-supply-90-mw-wind-turbines-for-talinay-oriente-wind-energy-project

News Release from Vestas

No_logo

Wind Industry Profile of


Chile - Vestas to supply 90 MW wind turbines for Talinay Oriente wind energy project

The project is scheduled for commissioning by the end of March 2013

With reference to company announcement No. 44/2012 of 20 November 2012, Vestas confirms the signature of a firm and unconditional purchase agreement for the Talinay Oriente project in Chile.

Danish wind turbine manufacturer Vestas has secured a turnkey supply contract from Italy-based Enel Group for the 90MW Talinay Oriente project in Chile.

The proposed project is located in the Limari province and will feature 30 Vestas V90 2.0MW turbines and 15 Vestas V100 2.0MW turbines.

Scope of the turnkey contract includes supply, installation and civil and electrical services at the Talinay Oriente project alongside a three year agreement for service and maintenance.

The project is scheduled for commissioning by the end of March 2013.

Source:
Vestas Central Europe
Author:
Posted by Trevor Sievert, Online Editorial Journalist / By Vestas Central Europe Staff
Email:
vestas-centraleurope@vestas.com
Link:
www@vestas.com/...



All news from Vestas

No_logo

news in archive





Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020