Posted by: Windfair Editors
SeaRenergy Poland to work on BC-Wind OSS permit design
Official Press Release SeaRenergy Poland:
SeaRenergy Poland signed BC-Wind OSS Permit Design Deal
Ocean Winds and Polish SeaRenergy entity have signed a contract to prepare a conceptual design, construction permit design documentation and obtain a permit for Offshore Substation for the BC-Wind offshore wind farm in the Polish Baltic Sea.
The scope of the contract covers OSS topside concept design including electrical design which creates a basis for the construction permit. Moreover, the preparation of the documentation necessary for applying and obtaining the Construction Permit is an integral part of this integrated service contract resulting in the final approval by the respective authorities. SeaRenergy will execute the project by including experienced partners also involving as much local content as possible to contribute to the Polish offshore wind... ... More: Official Press Release SeaRenergy Poland
- Keywords:
- SeaRenergy, Poland, Ocean Winds, conceptual design, construction permit design documentation, offshore, BC Wind, wind farm, Baltic Sea, OSS