2024-12-22
https://w3.windfair.net/wind-energy/news/45294-neoen-australia-developer-solar-wind-battery-storage-energy-transition-project-capacity-gw-target-construction-operation

Neoen reaches 3 GW of renewables capacity in Australia

The company’s portfolio of 20 assets in operation or under construction consists of 2 GW of generation capacity evenly split between solar and wind and 1.3 GW / 2.8 GWh of battery storage.

Official Press Release Neoen:

Neoen becomes the first company to pass 3 GW of renewable energy capacity in Australia

Wind Industry Profile of
Neoen becomes the first company to pass 3 GW of renewable energy capacity in Australia

Neoen has reached 3.3 GW of capacity in operation or under construction in Australia, confirming its position as the country’s leading renewable energy player / The 3.3 GW consists of 2 GW of generation capacity evenly split between solar and wind farms and 1.3 GW / 2.8 GWh of battery storage / The company’s decade-long track record of delivery and innovation has been instrumental in accelerating the pace of Australia’s energy transition / Neoen is targeting around 10 GW in operation or under construction in Australia by 2030 with a multi-billion dollar forward investment plan

Neoen (ISIN: FR0011675362, Ticker: NEOEN), one of the world’s leading producers of exclusively renewable energy, has reached 3.3 GW of capacity in operation or under construction in Australia... ... More: Official Press Release Neoen

Keywords:
Neoen, Australia, developer, solar, wind, battery, storage, energy transition, project, capacity, GW, target, construction, operation







Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.drakawind
  • Newlist_logo.windfair-us
  • Newlist_kaeufer_logo
  • Newlist_evergreensolar_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020