03/23/2008
UK - NorWind chosen by Statkraft to conduct concept study of offshore wind power
Statkraft has selected NorWind to conduct a concept study for a large, fixed-base wind power facility far offshore. The study aims to narrow the gap between today’s wind-power technology for shallow waters and the deepwater technology of the future.
Last year Statkraft challenged a number of Nordic high-tech firms as to how to build an offshore wind park of up to 1000 MW as early as 2012. Among the stipulations were that it should be out of sight from land and placed in sea depths of approx. 60 meters.
Six groupings submitted proposals for solutions. The competition was won by NorWind, a subsidiary of Scatec, in collaboration with OWEC Tower, Troll Power and Grieg Logistics.
The feasibility study, which is to be carried out as an open innovation process in the course of 2008, is meant to yield the most complete description possible of a construction concept for a field of up to 1000 MW installed capacity. The study is to help narrow the gap between current wind power technology for shallow waters and future deepwater wind-power technology. The agreement between Statkraft and NorWind contains no binding obligations for delivery or purchase of technology.
Last year Statkraft challenged a number of Nordic high-tech firms as to how to build an offshore wind park of up to 1000 MW as early as 2012. Among the stipulations were that it should be out of sight from land and placed in sea depths of approx. 60 meters.
Six groupings submitted proposals for solutions. The competition was won by NorWind, a subsidiary of Scatec, in collaboration with OWEC Tower, Troll Power and Grieg Logistics.
The feasibility study, which is to be carried out as an open innovation process in the course of 2008, is meant to yield the most complete description possible of a construction concept for a field of up to 1000 MW installed capacity. The study is to help narrow the gap between current wind power technology for shallow waters and future deepwater wind-power technology. The agreement between Statkraft and NorWind contains no binding obligations for delivery or purchase of technology.
- Source:
- NorWind
- Author:
- Edited by Trevor Sievert, Online Editorial Journalist / Author: Norwind staff
- Email:
- press@windfair.net
- Link:
- www.windfair.net/...
- Keywords:
- wind energy, wind farm, renewable energy, wind power, wind turbine, rotorblade, offshore, onshore