2024-12-22
https://w3.windfair.net/wind-energy/news/44011-octopus-energy-report-grid-connectoion-uk-wind-farm-green-project-fossil-fuels-gw-unlokced-queues-electricity-collaboration

Report: Octopus Energy reveals how to speed up green grid connection in the UK

Implementing this five-point-plan could unlock new wind and solar farms with clean electricity for around 2.5 million homes - covering the electricity needs for households in Manchester, Birmingham and Leeds combined every year.

Official Press Release Octopus Energy:

End the gridlock: Octopus Energy report reveals how to speed up green grid connection

Wind Industry Profile of
End the gridlock: Octopus Energy report reveals how to speed up green grid connection

Five steps outlined to speed up connection of new wind and solar farms / 2.5m homes could be powered a year by green projects unlocked by findings / Move would bring down bills and reduce reliance on polluting fossil fuels / Comes as UK has one of Europe’s biggest grid connection queues at 200 GW+

Queue-jumping, sunset clauses and a data-driven can-do attitude are simple ways to connect renewables to the grid faster, a new report by Octopus Energy’s generation arm outlines. Increasing competition in the connection process and greater collaboration between developers are the other two areas that will help unleash Britain’s colossal green energy potential. Implementing this five-point-plan could unlock new wind and solar farms with clean... ... More: Official Press Release Octopus Energy

Keywords:
Octopus Energy, report, grid connectoion, UK, wind farm, green, project, fossil fuels, GW, unlokced, queues, electricity, collaboration







Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.windfair-us
  • Newlist_kaeufer_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020